Please use this identifier to cite or link to this item: http://cmuir.cmu.ac.th/jspui/handle/6653943832/69211
Title: การบริหารจัดการน้ำท่วมพื้นที่ตำบลนาพูน อำเภอวังชิ้นจังหวัดแพร่
Other Titles: Flood Management in Napoon Subdistrict, Wangchin District, Phrae Province
Authors: วุฒิกร งามประภาสม
Authors: รองศาสตราจารย์ ชูโชค อายุพงศ์
วุฒิกร งามประภาสม
Issue Date: Nov-2015
Publisher: เชียงใหม่ : บัณฑิตวิทยาลัย มหาวิทยาลัยเชียงใหม่
Abstract: This independent study aims to flood management in Napoon Subdistrict, Wangchin District, Phrae Province. by study gathered data caused flooding in Moo 2 Ban Napoon and Moo 10 Ban Napoonphattana from the field survey and Seminars to find out the factors that caused the flood affected areas in Napoon Subdistrict. Then, the information to analyze the cause of the flooding. The identification of factors that influence the occurrence of flooding, according to the decision making branches. Seminars for ways to manage flooding. The officials from government agencies and officials of the Ministry of Napoon jointly solve the problems of flooding , including four projects (1) the construction of the check dam area number 3. (2) The project to dredge pond area number 150. (3) project to dredge the creek, piled distance of 2,000 meters. (4) Construction of earth dam area number 3. And has prepared a list of Bill of Quantities (BOQ) engages in each project. The guidelines define the primary and secondary criteria used to determine the following (1) Criteria for the construction: secondary criterion is the difficulty in design and ease of construction. (2) Criteria for construction costs. (3) Criteria for social rules : secondary criteria is affecting people and environment. (4) Criteria for construction rules: secondary criteria is direct impact on construction And indirect effects of the construction and (5) Criteria for receive benefits : secondary criteria is direct benefits and indirect benefits. Interviews with experts from the relevant authorities to issue a flood of 10 people conducted by the study include the second set. Including the first inquiry to be set up in weight by Analysis Hierarchy Process and The second set of Inquiry to know the level of satisfaction of each criterion for each project using the average. Then the values returned by the query came together to prioritize the implementation of flood protection projects . The priorities in the implementation of the points mentioned below. The project has the highest priority is The fourth project is the construction of the embankment soil is equal to 3.564, followed by the three projects of dredging the creek Ban Napoon is equal to 3.520, followed by the one projects is the construction of check dams Mae Poon creeek is equal to 3.152. The project is the least important is the two projects is the pond dredging project Ban Napoon area is equal to 2.673.
URI: http://cmuir.cmu.ac.th/jspui/handle/6653943832/69211
Appears in Collections:ENG: Independent Study (IS)

Files in This Item:
File Description SizeFormat 
Full.pdf12.08 MBAdobe PDFView/Open    Request a copy


Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.