Please use this identifier to cite or link to this item: http://cmuir.cmu.ac.th/jspui/handle/6653943832/77949
Title: การปรับปรุงกระบวนการการกำกับการปฏิบัติตามกฎหมายโดยใช้เทคโนโลยีสารสนเทศ
Other Titles: Regulatory compliance process improvement using information technology
Authors: ชลดา นาคแก้ว
Authors: อรรถพล สมุทคุปติ์
ชลดา นาคแก้ว
Keywords: ปรับปรุงกระบวนการ;เทคโนโลยีสารสนเทศ;การลดความสูญเปล่า;ลีน;เพิ่มประสิทธิภาพ
Issue Date: Jan-2023
Publisher: เชียงใหม่ : บัณฑิตวิทยาลัย มหาวิทยาลัยเชียงใหม่
Abstract: This research introduces the improvement of the regulatory compliance process using information technology applied with lean manufacturing technique to analyse problems of the process and develop the process of the regulatory compliance of some factory located in Lampang for complied with ISO 14001 and ISO 45001. To optimize the processes, there are many different tools had been used to collect data on the workflow, analysed root cause of the problem, identified the wastes activities, and specified methods improvement for reducing time and wastes in activity. For the evaluation of the result, compared the steps of activities before-after improvement and compared reduce time after improving. The results showed that many work steps took a long time, redundancy process, not apply process with information technology were the cause of the regulatory compliance process delayed. Therefore, the work process has been rearranged by using ECRS to improve the work process and apply information technology systems to help easier and faster. In conclusion of the research can achieve the objectives. The results able to reduce work steps from 15 to 9 steps by rearranging work process and eliminate unnecessary work steps. Applying Compliance Management System (CMS) to make simplifier and to reduce time of 4 tasks; 1) Legal considerations step which can reduce an average amount of time is 0.06 days from 7.7 days. 2) Legal compliance assessment step which can reduce an average amount of time is 4.8 days from 48.67 days. 3) Compliance monitoring step which can reduce an average amount of time is 19.31 days from 113.94 days. 4) Assessment summary step which can reduce an average amount of time is 0 day from 0.06 days. The cycle time of the process can be reduced from 170.37 days to 24.18 days.
URI: http://cmuir.cmu.ac.th/jspui/handle/6653943832/77949
Appears in Collections:ENG: Independent Study (IS)

Files in This Item:
File Description SizeFormat 
640632010 - ชลดา นาคแก้ว.pdf2.05 MBAdobe PDFView/Open    Request a copy


Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.