Please use this identifier to cite or link to this item:
http://cmuir.cmu.ac.th/jspui/handle/6653943832/61033
Title: | Arrester installations for improving the lightning performance of double circuits distribution lines |
Authors: | Thanaphong Thanasaksiri |
Authors: | Thanaphong Thanasaksiri |
Keywords: | Energy;Engineering |
Issue Date: | 1-Dec-2007 |
Abstract: | This paper presents method for improving the lightning performance of 22 kV double circuit overhead distribution lines by mean of arrester installations. For the same isokeraunic level, arresters installed on the different pole structures give the different lightning performance. To get the best lightning performance, arresters installed on every phases and every circuit at each pole should be done. To improve the lightning performance and for the economic reason, arresters installed on each circuit can be chosen. Two types of arrester installations have been investigated. The full installation, arresters installed on every phase (ABC), and the partial installation, arresters installed on any single phases (A, B or C) or any couple phases (AB, BC or CA). The full installation gives the better lightning performance when compare to the partial installation which can only improve the lightning performance to some degree. This work has been focus on arrester installations on each circuit, both for full and partial arrester installations. The arrester energy discharge has also been considered. |
URI: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=54949133711&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/61033 |
Appears in Collections: | CMUL: Journal Articles |
Files in This Item:
There are no files associated with this item.
Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.