Search


Current filters:



Start a new search
Add filters:

Use filters to refine the search results.


Results 1-10 of 10 (Search time: 0.002 seconds).
  • previous
  • 1
  • next
Item hits:
Issue DateTitleAuthor(s)
27-Aug-2009Transmission system reliability evaluation in the Central-1 and Northern regions of the Lao PDR in corresponding to transmission system development planP. Kongmany; S. Premrudeepreechacharn; K. Charoenpatcharakij
1-Oct-2009Decision analysis on generation capacity of a wind parkC. Kongnam; S. Nuchprayoon; S. Premrudeepreechacharn; S. Uatrongjit
27-Aug-2009Evaluation of switching overvoltage in 500 kV transmission line interconnection Nam Theun 2 power plant to Roi Et 2 substationT. Keokhoungning; S. Premrudeepreechacharn; K. Ngamsanroaj
27-Aug-2009Investigation of single phase reclosing using arc model on the 500 kV transmission line from Mae Moh to Tha Ta KoK. Ngamsanroaj; S. Premrudeepreechacharn
27-Aug-2009Effect of votage variation from distributed generation on very long distribution line with multiple voltage regulatorsS. Kongtripop; T. Kasirawat; C. Pongsriwat; S. Premrudeepreechacharn
1-Dec-2009Impacts of photovoltaic power generation on very long distribution lineR. Parameechok; S. Premrudeepreechacharn; T. Kasirawat
1-Dec-2009Small grid-connected PV-system with lossless passive soft-switching techniqueD. Amorndechaphon; S. Premrudeepreechacharn; K. Higuchi
1-Dec-2009The 3-phase 4-wire voltage sag generator based on three dimensions space vector modulation in abc coordinatesK. Oranpiroj; S. Premrudeepreechacharn; M. Ngoudech; W. Muangjai; K. Yingkayun; T. Boonsai
22-Oct-2009Implementation of a 1-kVA programmable balanced three-phase voltage sag generatorY. Kumsuwan; C. Boonmee; S. Premrudeepreechacharn
22-Oct-2009The 3-phase 4-wire voltage sag generator based on abc algorithmK. Oranpiroj; S. Premrudeepreechacharn; M. Ngoudech; W. Mungjai; K. Yingkayan; T. Boonsai