Please use this identifier to cite or link to this item: http://cmuir.cmu.ac.th/jspui/handle/6653943832/61662
Full metadata record
DC FieldValueLanguage
dc.contributor.authorP. Netibanedithen_US
dc.contributor.authorW. Rattanachuenen_US
dc.contributor.authorW. Tayatien_US
dc.date.accessioned2018-09-11T08:56:41Z-
dc.date.available2018-09-11T08:56:41Z-
dc.date.issued2006-12-01en_US
dc.identifier.other2-s2.0-33847217970en_US
dc.identifier.urihttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=33847217970&origin=inwarden_US
dc.identifier.urihttp://cmuir.cmu.ac.th/jspui/handle/6653943832/61662-
dc.description.abstractThis paper proposes an integrated maintenance scheduling and production planning algorithms for generator maintenance scheduling of a hydro power system. Hydro power station characteristics and constraints are taken into account in maintenance scheduling problem. The studied power system exchanges power with the neighboring country. The objective of this method is to optimize water value or revenue of the hydro power system with standard reliability constraints. The maximum and minimum reservoir operating curves are first determined from hydrology statistics. Then the limited energy of each sub-period is calculated. After that the three step searching is used to find the maximum revenue maintenance schedule. The water value is evaluated according to import and export tariffs. The maximum and minimum reservoir operating curves, the general maintenance constraints and the minimum reliability level are taken into consideration. Based on the proposed method, a computer program is developed and tested with a case study, an existing Electricite Du Laos (EDL) Region I hydro power system. The results confirm the proposed method a better maintenance schedules compared with the maintenance schedule employed by EDL. The system revenue increase of up to 20% is achieved while the reliability is still with in EDL standard.en_US
dc.subjectEngineeringen_US
dc.titleMaintenance scheduling of generating units in a hydro power system: A case study of EDL region Ien_US
dc.typeConference Proceedingen_US
article.title.sourcetitleProceedings of the IASTED International Conference on Energy and Power Systemsen_US
article.volume2006en_US
article.stream.affiliationsElectricite du Laosen_US
article.stream.affiliationsElectricity Generating Authority of Thailanden_US
article.stream.affiliationsChiang Mai Universityen_US
Appears in Collections:CMUL: Journal Articles

Files in This Item:
There are no files associated with this item.


Items in CMUIR are protected by copyright, with all rights reserved, unless otherwise indicated.